Preparatory work for rail drilling operations

- Jun 07, 2018 -

  1. Check carefully whether all parts of the drilling machine are complete.

    blob.png

  2. No loosening of the screw

    blob.png

     

  3. Whether the lubricating oil has reached the required position.

  4. whether the control button is flexible and reliable.

    blob.png

  5. Drill rod and drill have no damage

  6. No fracture of the support frame

  7. Whether the spray facility is in place.

    blob.png